Asbestos Removal in South Gate

At South Gate Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Small one-story stucco house in a pink-beige tone with green trim, a gabled porch roof, a short front walk, a lawn and an orange tree with fruit at the left of the yard
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Stairway with wooden railings under a textured ceiling, with small tan square patches on the ceiling and wall and white sample bags on the covered floor and bottom stepRoom with a textured ceiling, clear plastic sheeting over the walls, windows and floor, and a portable air machine with a ribbed hose in the corner

Asbestos testing and surveys

Testing is the first step on every job. We book a Cal/OSHA-certified asbestos consultant or technician to take the samples, and a lab tells us what each one holds. We then walk you through the findings and what they mean for the work. Please do not take samples yourself.

Popcorn ceiling removal

Nothing gets scraped until a sample of the popcorn or other texture has been through the lab. A positive result means we remove the texture and haul it off, and a negative one means that ceiling needs no asbestos work.

Hallway with a patterned brown and beige vinyl floor, plastic sheeting along the left wall, a sheer curtain at the right, a paneled door and an open door to a small bathroomGutted bathroom with a bathtub, bare wall framing behind it, patches of small white floor tile torn up, pink and aqua wall tile on the right and plastic hanging at the left

Floor tile and mastic removal

Old vinyl tile, sheet vinyl and the adhesive under them are tested before a floor comes up. Tile that contains asbestos is lifted wet and sealed up for disposal. We take on one bathroom floor or a whole house, and we plan around floors that were covered over instead of pulled up.

Drywall, joint compound and plaster removal

Plaster, the lath behind it, drywall and joint compound are tested before a wall is opened. When a sample shows asbestos, we remove that material and send the waste out under California’s disposal rules. We take on one wall, a room or a whole floor of rooms.

Attic with plank flooring, two large silver-gray round ducts running along the rafters, loose insulation along the sides and daylight from a small vent window at the far endSmall single-story house with light siding behind a chain-link fence, a metal dumpster lined with white plastic at the curb and bare dirt in front, under a gray sky

HVAC duct and pipe insulation removal

Wrap and tape on old ducts and insulation on pipes are tested first. We remove the wrap, tape or insulation that tested positive and haul it away. A furnace or duct change-out counts as renovation under the district rule, so the survey comes before the HVAC contractor starts, unless it is a single-unit house job under 100 square feet.

Renovation and demolition abatement

Before a remodel opens walls or a house comes down, the survey and the district notice come first. We take out the asbestos material the survey found, from a single room to a whole house, so your builder or demolition crew can start.

Asbestos testing and removal costs

More than 8 in every 10 South Gate homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in South Gate, Cudahy and Montebello. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

Sampling by a Cal/OSHA-certified consultant or technician, an accredited lab reading of each sample and one written report. The air test after removal is run by an independent consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The room covered in plastic with air filters running, the texture soaked and scraped into bags, a final cleanup and the haul. Skim coating, new texture and paint are extra.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The work area sealed, tile or sheet vinyl lifted, the black mastic beneath removed where it tested positive, bags hauled out and the room cleaned. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment and air filters, the wall or ceiling material that tested positive removed wet, bagged and hauled, then a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, closet or pipe run, positive wrap or tape removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The positive materials come out before the remodel or demolition crew begins, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quoteSee an example project

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding or roofing is extra.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Prewar houses and layered floors

Under Rule 1403 of the South Coast Air Quality Management District, a thorough survey for asbestos comes prior to any demolition or renovation, apart from a small renovation of a single-unit house. Flooring is surveyed through every layer down to the joist level, and wall or ceiling cavities are included as necessary to identify and sample the material in them. That matters when a floor was covered over instead of pulled up, since older material can sit under the new one.

Surveys are performed by a Cal/OSHA-certified consultant or technician who holds EPA Building Inspector training. We line up the visit and the lab, then build the removal plan around what the findings list.

Plaster, lath and joint compound

Plaster over wood lath and the joint compound on drywall seams are wall materials we sample before anyone cuts, sands or scrapes them. A lab result is how you know what is in them.

Crumbled plaster and scraped-off texture are friable, and California handles friable asbestos waste at 1 percent or more as hazardous waste. The state’s limit covers asbestos only when it is in a friable, powdered or finely divided state. Such waste leaves with a licensed hauler and a manifest. Intact tile is lifted wet and sealed, and that table does not catch it, though other agencies may still restrict it.

Housing in South Gate

South Gate’s oldest homes date to before 1950, which describes more than 4 in every 10 of them, and half of South Gate’s homes were built in or before 1952. More than 8 in every 10 were built before 1980.

South Gate counts more than half of its households as renters. One-unit homes are more than 6 in every 10 of the homes, and 16.9 percent of the homes belong to buildings with five or more units, a mix of houses and apartment buildings.

Landlords and property managers follow the same survey rule as owners. Rule 1403 covers houses and apartment buildings alike, and it names apartment buildings, townhouses and condominiums as not residential single-unit dwellings, so single-unit provisions never reach them.

Renovation versus demolition under the district rule

A remodel that takes out a load-supporting part of a building becomes a demolition. In the rule, demolition means the wrecking or taking out of any structural member that is load-supporting, and a wall carrying the roof or the floor above is one.

Demolition always needs the district notice ahead of the work, whether or not asbestos is found. The notice goes to the district no later than 10 working days before the work starts, and we file it online. A district notification fee goes with it.

A furnace or duct replacement is surveyed the same way a kitchen remodel is. Under the district rule, putting in or taking out an HVAC system, meaning heating, ventilation and air conditioning, counts as renovation, so the sampling comes before the heating contractor shows up, unless it is a single-unit house job under 100 square feet.

Nothing on this page is legal advice. For questions about your own address, ask the building department or call (909) 396-2336, the number for the district’s asbestos hotline. We cannot settle address questions here.

Our process

01

Samples and a walk-through

We arrange for a Cal/OSHA-certified consultant or technician to sample the materials, and a lab sends back the results. Then we go over the project and the report together, so the removal plan covers each material the work will open.

02

District notice and setup

If the job needs a district notice, we submit it online and set the schedule around it. After that comes the work area, which we set up so material that tested positive can come out.

03

Removal and the air test

We remove the material that tested positive, clean up and haul the waste away. An independent consultant takes the clearance air test afterward, since the removal contractor does not test its own air.

Serving South Gate, Cudahy and Montebello

We also serve Cudahy and Montebello. Call us for confirmation if your address is outside the area.

Frequently asked questions

What does the owner-occupant provision cover?

A few conditions decide it. The owner lives in the house, personally does the renovation and uses no paid or volunteer help, and the house is occupied rather than rented out or used for business. Work that meets all of them falls under the Rule 1403 provision for an owner-occupant of a residential single-unit dwelling, but demolition never does. The district still advises against it, citing potential exposure and/or cross contamination. Please do not take samples yourself. Waste set outside the house is still regulated.

How do I check a contractor?

Ask any asbestos contractor for its Contractors State License Board number, then look it up. The rules for 100 square feet or more of asbestos-containing material need the C-22 Asbestos Abatement classification or a license qualifier who passed the asbestos certification exam. Cal/OSHA registration for the crew’s employer is also required before the job starts, since those rules protect the workers.

What decides the price?

Mostly the amount of material, along with the lab work, the number of rooms and how easy the area is to reach. If the job needs a district notice, the notification fee is based on the amount of asbestos removed. You can call us for a free, personalized quote on your own project.

Does a newer house skip the survey?

The survey rule sets no build-year cutoff, so age alone does not excuse a house. The small-job survey exemption for single-unit homes depends on the amount of material, and you can read it under asbestos testing and surveys.

Does a survey clear later work?

No. A survey is a record of the samples taken, the spots they came from and the results, and it says nothing about material no one sampled. If a new wall, floor layer or ceiling gets opened after the plan changes, that material is sampled before the work goes ahead.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (562) 635-8314

Call (562) 635-8314